Tag Archives: Ecclesbourne Valley Railway

Oily Interlude

This year’s B-exam on 33035 concluded with an oil and filter change. Two barrels of oil were ordered up, and a new set of filters delivered. The Class 33s do not have a sump drain, as this was removed long … Continue reading

Posted in Ecclesbourne Valley Railway, News, Restoration | Tagged , | Leave a comment

Gatwick Express

With the Ecclesbourne Valley Railway taking a winter break from passenger services, its the time of year for various maintenance tasks. 33035 will be having a B exam and a number of minor repairs, particularly the ongoing quest to seal … Continue reading

Posted in Ecclesbourne Valley Railway, News | Tagged , | Leave a comment

Winterisation

In the 8 weeks since its return to service, 33035 has been at work on the Ecclesbourne Railway for no less than 13 days, so far… 9 of these have been for Diesel Experience duties, usually on Wednesdays and Fridays, … Continue reading

Posted in Barrow Hill, Ecclesbourne Valley Railway, News, Restoration | Tagged , , , | Leave a comment

Service Now Resumed

After a five month interlude for generator repairs, 33035 burst back into life yesterday, starting first time as if it was just five minutes since its last run! The exhaust and inlet manifolds had been re-fitted, batteries charged and wiring … Continue reading

Posted in Ecclesbourne Valley Railway, News, Restoration | Tagged , | Leave a comment

Special Delivery

A 9 1/2 ton special delivery was signed for last Thursday, when the generator returned from Bowers.  As you might guess, the refitting was the reverse of the removal, with the generator loaded first, followed by the turbocharger and the … Continue reading

Posted in Ecclesbourne Valley Railway, News, Restoration | Tagged , | 3 Comments

The Tide has Turned

After many months of taking things apart, we have finally made a start on building the engine back up on Sherwood. This turning of the tide was signified by fitting of the first liner back into position B1 of the … Continue reading

Posted in Barrow Hill, Ecclesbourne Valley Railway, News, Restoration | Tagged , , , | Leave a comment

Generator Assembly

The last two weeks have seen much activity with overhaul of the generator, turbocharger and engine governor for 33035. Banding tapes were wound on each end of the main, auxiliary and ETH coils of the armature, then cooked in the … Continue reading

Posted in Barrow Hill, Ecclesbourne Valley Railway, News, Restoration | Tagged , , | Leave a comment

Generator Game

A visit to Bowers found much work in progress with 33035′s generator. The field frame has been cleaned and tested to check the insulation and cabling, and has been finished off in anti-tracking paint. The brush gear has been dismantled … Continue reading

Posted in Barrow Hill, Ecclesbourne Valley Railway, News, Restoration | Tagged , , , | Leave a comment

Damage Assessment

33035′s generator has been dismantled at Bowers, allowing a close inspection of the damage to the ETH section of the armature. As this picture shows, a sizeable chunk has blown out from the area where one of the windings crosses … Continue reading

Posted in News, Restoration | Tagged , , , | Leave a comment

Up, Up and Away

Since the generator disgraced itself on Good Friday, we have been preparing for the big lift to remove it for repairs. The biggest challenge was the ring of bolts connecting the end of the generator to the engine crankshaft, which … Continue reading

Posted in Ecclesbourne Valley Railway, News, Restoration | Tagged , | Leave a comment